WENFEI ELECTRICAL
QUALITY ASSURANCE SYSTEM

Quality
Control
Framework

Full-process quality control system ensuring excellence and reliability from raw materials to finished product delivery for every transformer and voltage stabilizer.

01

Incoming Quality Control IQC

Establish supplier admission and evaluation mechanisms, prioritizing qualified raw material suppliers.

Strict testing of silicon steel permeability, copper conductivity, and insulation material voltage ratings.

Test Items
Permeability / Conductivity
Standard
100% Inspection
02

In-Process Quality Control IPQC

Core: Monitor lamination flatness and stacking factor.

Winding: Inspect turn count and winding tension.

Assembly: Check clearances and wiring correctness.

Control Points
3 Major Processes
Frequency
Real-time Monitoring
03

Final Quality Control FQC

100% full-load testing including insulation resistance (≥100MΩ), withstand voltage, and regulation rate verification.

Resistance
≥ 100MΩ
Coverage
100% Full Test
04

Quality Traceability QTM

Establish complete production digital records for each batch, enabling rapid root cause tracing within 24 hours.

Traceability
Batch Records
Response
24H Analysis
ISO 9001 Certified
EU CE Compliant
Full Process Control